awesomechecklists
llms.txtGitHub ↗
/

16 — Reliability and Disaster Recovery Checklist#

Verify that critical user journeys remain usable under expected failures and can recover within agreed downtime and data-loss targets. Reliability, backup/restore, disaster recovery, and business continuity must be demonstrated with evidence, not assumed from redundancy alone.

Scope: Frontend-specific. This file is one part of the 16_Reliability_and_DisasterRecovery.md checklist. Apply the domain-wide release gate across all applicable scope files; each checklist ID remains unique.

Using this checklist: Review method, evidence requirements and priority interpretation · Optional framework crosswalk. Priorities below are project-adjustable starting tiers, not universal release or legal requirements.

Frontend Checks#

  • REL-098 P2 Define a clear user-facing experience when essential backend services are unavailable or degraded.
  • REL-099 P1 Provide understandable loading, retry, offline, maintenance, and recovery states for critical user workflows.
  • REL-100 P1 Distinguish transient connectivity failures from account, permission, validation, and permanent application errors.
  • REL-101 P1 Prevent repeated submission of high-impact actions when an API outcome is unknown, and explain how the user can verify completion.
  • REL-102 P1 Preserve in-progress form content and other recoverable user input during temporary failures when appropriate.
  • REL-103 P1 Ensure failed background saves and offline edits are surfaced rather than silently discarded.
  • REL-104 P2 Define how stale or cached content is labeled when freshness could change a user decision.
  • REL-105 P1 Test deep links and core navigation when an origin server, CDN, or supporting API becomes unreachable.
  • REL-106 P1 Verify cached frontend assets and service-worker versions remain compatible with recovered backend contracts.
  • REL-107 P1 Provide an accessible alternative to live, auto-updating UI status messages for screen-reader and keyboard users.
  • REL-108 P1 Explain temporarily disabled features and offer useful alternatives rather than presenting controls that fail without feedback.
  • REL-109 P1 Use bounded client retries and avoid refresh loops or aggressive polling that amplify backend outages.
  • REL-110 P1 Test session expiration, authentication-provider outages, and recovery without losing unrelated user state where feasible.
  • REL-111 P1 Check that dynamic application content remains coherent during cross-region traffic changes or cached DNS transitions.
  • REL-112 P1 Verify that outage banners, status pages, and support links remain accessible using an independently resilient channel when warranted.
  • REL-113 P1 Confirm UI behavior when partial data loads, individual widgets fail, or several API requests return inconsistent versions.
  • REL-114 P1 Test that primary user journeys recover correctly after service restoration without requiring unsafe manual cache clearing.
  • REL-115 P1 Make post-recovery data reconciliation or duplicate transaction warnings visible where the business workflow requires them.

Release gate#

  • Critical service journeys and data have assigned owners and measurable availability, RTO, and RPO targets appropriate to their business impact.
  • Important failure modes and dependency risks are assessed, and resilience controls have been exercised or supported by an explicitly accepted risk-based plan.
  • Required backups are current, access-controlled, and demonstrated restorable through recent drills that verify data integrity and recovery objectives.
  • Disaster-recovery activation, roles, communications, recovery order, cutover, and failback procedures are documented and rehearsed to the level required by service risk.
  • Critical API and frontend flows degrade safely, avoid unintended duplicate actions or data loss, and recover coherently where those interfaces exist.
  • Outstanding reliability risks, failed recovery tests, and objective breaches have a documented disposition, owner, remediation date, and authorized release decision.

Domain-specific approval rule: Block reliability sign-off when an unaccepted failure mode can disable an essential service, when required backups cannot be restored, when recovery targets are demonstrably missed without authorization, or when data integrity and recovery ownership are unresolved. A written runbook or backup job success alone does not prove recoverability.

Optional tooling: Frontend test examples, not prerequisites or verification evidence.

Trusted references and scope#

These verifiable review questions are informed by authoritative engineering and contingency-planning guidance. They are not copied standards language and do not imply universal compliance or guaranteed availability.

Applicability: Define targets and test depth according to criticality, business impact, and actual platform. Multi-region deployments, active-active replication, Kubernetes disruption budgets, and zero-data-loss objectives are not universally required. A PodDisruptionBudget addresses supported voluntary Kubernetes evictions, not all outages. Avoid fault tests that could harm production users without proper authorization and safeguards.

Source review date: 2026-11-12.